Shutters Installation Tips

Shutters Installation Tips

SHUTTERS INSTALLATION GUIDE

Step 1 – Linking The Frame.

Hold end cap into left side of reveal as shown. End caps are marked Left (L) and Right (R). If possible, mount cap 10mm in from front of reveal edge, screw into place with parts supplied.

Step 2 – Fixing The Frame.

Insert blind into end cap, keeping thumb between top slat and head box to avoid trapping slat in end cap.

Step 3 – Adjusting Your Installation.

Close cap with firm push. Ensure small metal tongue clicks into retaining slot. This is Important!

Finishing Touches

For inside mount installations, insert the wood plugs into the hole on the frame.
For outside mount installation with an L frame, place a small daub of filler into the frame hole.
If required you can run a thin line of filler or sealant between your shutter frame and your wall.
REMEMBER – we are here to help you. Please don?t start on something you?re not sure of. If there?s anything that you are not sure about please call us at The Wood Blind Factory for help on 08 8377 5200.

Find more information by downloading the following file: Installing-plantation shutters.pdf